Track plans
The Port
Inside the port operations area there is an electrified loop track together with a number of loading, unloading and hardstanding tracks. The loop track has an obstacle free length of 375 m and other tracks are approx. 250 m. Track plan showing rail facilities inside the Pitea Port & Hub operations area.
Track plan showing rail facilities inside the Pitea Port & Hub operations area.
Energy railway yard
After the railwayyard at the port of Piteå comes the Energy railway yard. This yard is meant to to support the petroleum- and liquefied petroleum gas loading onto the railway.
Backen
By the Backen industrial track there is a non-electrified industrial track consisting of a main track and four shorter tracks for loading, unloading or hardstanding, connected to various areas of operation such as goods trading, scrapping and chemical management.